How our SECRET software "K.I.R.S.T.E.N" Changed the way we build forever!
Proven across 1060 apartments and counting >>>> Gifted to your site Team to use! See how it works HERE >>



⭐⭐⭐⭐⭐

⭐⭐⭐⭐⭐

⭐⭐⭐⭐⭐
Lets Face it!
A building with multiple structural elements is a slow and expensive one, with internal fit out taking longer than it should.
That's where Stackcell Stuctures comes in...
the system is insitu concrete walls and slabs.



Its like "building on steroids'" It not only drives the structure up super fast...
but also allows early fit out, due to the monolithic concrete walls and slabs.
The stackcell formwork comprises of an injection moulded plastic spacer ,which is sandwiched between two sheets of 9mm form-ply to form a module size 2820mm x600mm.
One complete module weighs 24kg and are made on your project, by the carpenters.
Lets call it "ON Site Manufacturing" The self compacting concrete is poured using a boom pump in a 3D printing fashion, by pouring the 1st layer up to 1m, and continuing with the 2 subsequent pours in the same day.




A NEW construction formula” and concrete formwork system unveiled here are not just tools; they're catalysts for transformative change.
Prepare to reimagine your approach as you delve into a realm where innovation meets efficiency.
The narrative unfolds to reveal an automation revelation, a cornerstone of unprecedented efficiencies on construction sites.
This isn't just about construction...
it's about rewriting the narrative of possibility.
We embrace the basic fundamentals of insitu concrete design and implementation, weaving them into a seamless tapestry of consistent progress.
Because we use the Stackcell structure system!
By using a standardised layout of walls with simple reinforcing, on each floor, the build duration for each floor is guaranteed, which enables us to lock in concrete pours far in advance of industry norms. ( 4-6 months out)
What about rain!
We love the rain!
We pour in any weather, with the exception of those really bad days.






Because Stackcell is a carpentry based formwork system, it is easily formed with walls/beams and columns.



As per AS1530.4-2014, section 3. Vertical separating elements- Loadbearing . a 140mm Stackcell wall achieves 240/240/240 (4hrs)
Ref test report: PF2424148
Absolutely!
Its the same information you provide over the phone to dispatchers, we just simplified and automated it!
Good Question! Yes, the optimal layout of walls is to provide 6m spans for the Traydec flooring, but we have done 6.5m spans and 7m spans.
It just means the slab thickness increases from 180mm to 200mm and 260mm. Keep the walls on all floors the same for optimal structural design.
For optimal cost advantage, the walls should line up vertically through the upper floors to reduce any transfer structure loads.
Yes, the exterior facade formply gets taken off to comply with the "no combustibles in the cavity rules".
The internal Formply remains on, but could be taken off if required, and walls skimmed with plaster.
No, because it is 30mpa concrete and by using our self compacting mix, it is very dense. More dense in fact than traditional concrete.
This is the reason, the internal fitout can begin without the external cladding being complete yet. We are seeing crush test results of 46mpa at 28 days.
Yes, absolutely! We offer a supply only option for your own carpenters to use and install the walls.
We give you a quick show and tell and you are off!
About 15-20% cheaper than blockwork! You see, blockwork requires heavy scaffold internally, lots of different types of reinforcing, cutting saws, trained blocklayers, waste bins, water etc.
Yep! .....The formula is this.
start on site date - completion date (working days)/number of apartments
Its a Volume metric. The larger the development, the faster it goes.
Yes, absolutely! It is a free service when you use the Stackcell structure system on your project.
We advise your project manager or site team on how to use it, set you up with it. The great part is, once you use it once, you will wonder why the heck you didn't do it sooner!
Yes, you can for sure! But the automation features fall away and it becomes more expensive.
Its kinda like taking 4 of the 8 ingredients out of a chocolate cake recipe, and instead of following the recipe ,you make your own. Both cakes taste good, one just costs more! and takes longer!
We would prefer to offer you a supply only option then for the site teams to control.
Yes, you can. However, we have found these to be 20-30% more expensive than Traydec ,because of the shopdrawing process/design, double handling of flat slabs/beams .
If you think about it, why would you pour a flat slab in a factory miles away from your site, transport it on large trucks, sort it on site, double prop the slab, and then.....Pour it again! with a topping slab.
We recommend Traydec for ease and cost effective builds as seen across the last 1000 apartments already.
Yes, columns and beams can be done with Stackcell. We use 18mm formply and plastic extrusions to match, to form these.

"How to build Concrete apartment developments in under 3.5days"
Privacy Policy | Terms and Conditions | Refund Policy
Stackcell Structures Limited 2019 & beyond - ALL RIGHTS RESERVED -Level 8, 139 Quay Street, Auckland, New Zealand 1010 TEL:+6421514555