- Case Study 1-

How Sound Living built 51 Durable, Solid Concrete apartments in 134 working Days!

 

Using the exact same materials every other Builder uses!

Discover the Simple, overlooked Strategy, that Every Developer can't See......Yet! 

P.S the programme software that delivered this project is a "Done for You service".

134 working days is the Total Structure programme from foundation start to full completion of structure.

But here's the crazy part....

Full completion will be done in 189 working days!

challenges-5 png

How is that Possible?? 

Because its Automation at the Coal face!

By using the K.I.R.S.T.E.N programme method. (keep It Real Simple Team Efficiency Node) 

and the STACKCELL Insitu formwork. 

  • ​Concrete pours are automated, so you don't need to email or call batching plants.
  • Only 1 structure product -Concrete!​, Less touch points ,less contractors, less margins.
  • ​Internal fitout begins after 2nd floor pour, because its watertight!
KIRSTEN

   How it works .

challenges-4 png

How can fitout begin sooner!

The slab above keeps water out.

A monolithic system of concrete walls and slabs forms a watertight concrete box. 

Its just Concrete!

  • ​Gib deliveries booked months in advance, so no delays in Winstone delivery times.
  • Kitchens and Benchtops booked months in advance, - Suppliers love this!
  • ​Many other trades automated, so you can complete in half the time.
challenges-1 png

Here is the exact programme used!

Done for you Service

issued a few days before ground floor slab.

  • ​Developer site manager is issued the K.I.R.S.T.E.N programme to use, Plug and play.
  • Firth concrete dates issued for entire project, so you can be assured of timely delivery.
  • ​Guaranteed pour dates, so you can link to internal trades.

It's so simple, you will wonder why the Heck you haven't discovered it before! 

Why your Daily P&G cost matters! 

Have you worked it out yet? 

 Scaffolding total cost              - $

 Staff costs on site                  - $

 Cranes on site                       - $

 Portacoms/Tempory services     -$

 Offsite overheads                  - $
​                                          -----------

Total P&G cost for Project          $$
​                                             

Total P&G cost 
​                            ------------------------  =  Daily P&G cost
​Total working Days

What if Sound Living overshot their K.I.R.S.T.E.N end Date??

By , say 30 days?? 

It would be an Eye watering experience .


​Here is the breakdown:

30 days x Daily P&G = Total wasted $


This is the unrealised waste that is occuring in the Building industy!!




1st concrete pour to last concrete pour 

= 6.7 Months

with insitu poured Reinforced Concrete

"All Concrete and internal trades booked months ahead"

Full Structure contract ,managed by young site manager, Elliot Whittaker.
(Connect construction Ltd -Build partner of Stackcell)

...Too Easy! 

No other management staff required!

If you think its right for you.

Privacy Policy | Terms and Conditions | Refund Policy 
Stackcell Structures Limited 2019 & beyond - ALL RIGHTS RESERVED -Level 8,  139 Quay Street, Auckland, New Zealand 1010  TEL:+6421514555

Please note that individual results may vary, and each individual Development or Contracting company may have their own style of programming projects. The KIRSTEN programme method needs buy in from your site manager and individual trades for it to create massive results.

Powered by